Westfield State University Hall

The Challenge Design, manufacture and install a custom window system to tie into the building’s AVB system and design & engineer a hung, multi-story curtain wall system to resemble the randomness of tree branches. The Solution

West Springfield High School

The Challenge Develop a consistent, coherent communication plan to coordinate a job with many products within one larger project. The Solution The Project Manager worked closely with Fontaine Brothers and the architect to make sure the products were installed in a timely fashion. Meetings and well thought out, detailed shop drawings were key to coordinating … Read more

Wahconah Regional High School

The Challenge Deliver an intricate designed scope within the construction manager’s aggressive schedule. The Solution This was a true team effort across the company, from the shop to the field, to ensure we could fabricate and install our scope during one of Chandler’s busiest times. Multiple crews were utilized to install the majority of the building … Read more

Tufts Library in Weymouth, MA

The Challenge Construct a modern library with state-of-the-art building products and glazing materials that meet LEED silver requirements. The Solution To procure multiple systems from USA, Germany and Switzerland that meet the demands of the project. Executing a team approach which allowed for understanding and applying of new construction techniques in both shop fabrication and … Read more

Plymouth Trial Court

The Challenge The architectural design of the Plymouth Courthouse required Chandler’s expertise in fabricating and installing very large, oversized windows to achieve the aesthetics they desired. The Solution

Ford Hall, Smith College

The Challenge Complete the highly technical scope of The Engineering & Molecular Science Building in a tight time frame. The Solution The Project Manager dedicated his full attention to the job. It was imperative to have a seamless communication plan between Chandler, the G.C. and other trades in order to complete a highly technical job … Read more

Brightwood-Lincoln Elementary School

Brightwood-Lincoln Elementary School is a 150,500 square foot building which will consolidate two existing elementary schools, both which were built over 100 years ago.  Each school will still have an individual identity, with separate entrances and academic areas for the students, but will have communal recreational areas.   The new building features natural day lighting, a sustainable design, … Read more

The New Cape Cod Regional Technical High School

The Challenge Furnish and Install Impact Rated facade systems for the nearly all glass 21-Centrury Regional School on Cape Cod. The Solution Our experienced team worked in conjunction with the General Contractor regarding fabrication and the installation sequence that fit within the schedule and flow of the construction project. Unique outward sloping and inward sloping … Read more

Basketball Hall of Fame

The Challenge The building’s composite panel system needed to be engineered and installed to meet the project’s unique architectural design intent. The Solution

Dearborn STEM Academy

The Challenge Design and Engineer hung curtain wall system with integral custom horizontal and vertical sun screens in the heart of Boston on a very challenging footprint. The Solution photo credit: Paul Warchol photography